The City of Norwalk is soliciting bids for interior renovations within the Fire Apparatus Repair Facility. The scope of work generally involves interior renovation of the office space vacated by the Fire Prevention Bureau and the conversion of the space into staff facilities associated with an operating fire station. The area of renovation is approximately 2,800 square feet. New uses shall include bunk room, offices, day room, kitchen and dinning area. Work shall consist of interior demolition, relocation of existing building devices and equipment, construction of new walls, lighting/outlets, new interior finishes and painting. In addition, modification to existing HVAC, electrical, plumbing, fire sprinkler and fire alarm systems will be required. The estimated project cost is $65.000.
Click here for more information....
Addendum #1 issued 06/23/2011
Publication Date/Time:
6/16/2011 7:00 AM
Closing Date/Time:
7/6/2011 2:00 PM
Electronic Recycling center Based in Sarasota, Florida. We specialize in IT disposal, electronic equipment and wire strip outs, asset recovery and technology recycling. We buy All smartphones, Ipads, Ipods, Galaxy. Broken or working. Reduce Reuse Recycle. 1.352.292.2736
Thursday, June 30, 2011
Demolition project bid: THE UNIVERSITY OF ALABAMA AT BIRMINGHAM BIRMINGHAM, ALABAMA
The Board of Trustees of the University of Alabama for the University of Alabama at Birmingham (UAB) requests bids for:
*Lane Center Demolition, 410 13th Avenue South, Birmingham, AL *35294,
*UAB Project No. 110002AP
UAB is a Signatory Sponsor to and affirms The Birmingham Plan - Construction Industry Program (see the requirements thereof as stated in Paragraph 12 of the Supplementary Instructions to Bidders, Specification Section 00120 and Standing Addendum No. 1 to the Supplementary Instructions to Bidders).
A Pre-bid Conference will be held *Friday, July 8th, 2011, 9:00 AM at The Lane Center Building, Cafeteria (parking provided in surface lot behind The Lane Center.
Bids will be received until *2:00p.m. CST on Wednesday, July 20th, *2011 and will thereafter be publicly opened and read aloud in Room 105 of the Facilities Administration Building, 801 6th Avenue South, Birmingham, AL 35294-4554. Bids must be submitted on Proposal Forms furnished. Bids shall be clearly identified on the exterior of the package with the bidder’s name, address, State license number, the name of the project being bid, time and place of the bid opening. Sealed bids shall be properly identified.
On the date of the bid opening Bids may be hand delivered or received by Express Service mail at the Office of the Associate Vice President for Facilities, 801 6th Avenue South, Facilities Administration Building, Room 154, Birmingham, AL 35294, or received by US Postal Service mail at the Office of the Associate Vice President for Facilities, FAB 154 1530 3rd Avenue South, Birmingham, AL 35294-4554 respectfully *until 12:00 *noon. After 12:00 noon of the date of the bid opening, bids must be hand delivered and presented at the bid opening. One original copy of the sealed bid shall be submitted and shall be properly identified. All bids received after *2:00 P.M. on Wednesday July 20th, 2011 will be returned unopened.
Construction Contracts shall be awarded only to qualified Contractors, licensed by the State Licensing Board for General Contractors, as required by Title 34, Chapter 8, Code of Alabama. Construction Contracts in excess of $50,000 shall be awarded only to Contractors licensed as required by the 1978 Code of Alabama, Title 34, Chapter 8 as amended. Formal pre-qualification for bidders is not required, however, bidders must be “responsible” in accordance with criteria in the bid documents and as stipulated by Title 39-2-4-(e) of the Code of Alabama.
A Cashier’s Check drawn on an Alabama Bank or bid bond, executed by a Surety company duly authorized and qualified to make such bonds in Alabama, payable to The Board of Trustees of the University of Alabama in the amount of 5% of the amount of bids, but in no event more than $10,000.00, must accompany the bidder’s bids. Performance and Labor and Material Payment Bonds in the amount of 100% of the contract price will be required when the Contract is presented by the Contractor to the Owner.
UAB has designated that bid documents will be available for examination at the Plan Room of McGraw-Hill Construction Dodge, 3000 3rd Avenue South, Birmingham, AL 35233; at AGC Internet Plan Room, 5000 Grantswood Road, Irondale, AL 35210; at The Birmingham Construction Industry Authority, 3600 Fourth Avenue South, Birmingham, AL 35222; and at the Reed Construction Data Office, 30 Technology Pkwy. South, Suite 500, Norcross, GA 30092-2912. Plans will be available for purchase, at cost to bidders, from Alabama Graphics in Birmingham, AL.
*Scope of Work:
This project involves the demolition of an existing 2 story (plus partial basement) structure identified as the Lane Center Building, located at 410 13th Street South, Birmingham, AL. Work limits are limited to the building’s footprint and immediate adjacent area. Existing utilities are to be capped, terminated and marked for future identification by the Owner. Partial basement void is to be filled to grade per the contract documents.
BT06/23/11
###
__________________
*LEGAL NOTICE
In accordance with Chapter 1, Title 39, Code of Alabama, 1975, notice is hereby given
that *BENNETT BUILDING, INC., Contractor, has completed the Contract for Construction of
Classroom Addition at West Blocton High School and Cafeteria Addition at West Blocton High School (09-193)
at *4734 Truman Aldrich Parkway, West Blocton, Alabama
for the State of Alabama and the* Bibb County Board of Education, Owner(s), and have made request for final settlement of said Contract. All persons having any claim for labor, materials, or otherwise in connection with this project should immediately notify
McKee and Associates Architecture and Interior Design
P.O. Box 2108
Montgomery, Alabama 36104
Bennett Building, Inc.
120 Shadey Acres Road
Alabaster, Alabama 35007
BT06/23/11
###
*Lane Center Demolition, 410 13th Avenue South, Birmingham, AL *35294,
*UAB Project No. 110002AP
UAB is a Signatory Sponsor to and affirms The Birmingham Plan - Construction Industry Program (see the requirements thereof as stated in Paragraph 12 of the Supplementary Instructions to Bidders, Specification Section 00120 and Standing Addendum No. 1 to the Supplementary Instructions to Bidders).
A Pre-bid Conference will be held *Friday, July 8th, 2011, 9:00 AM at The Lane Center Building, Cafeteria (parking provided in surface lot behind The Lane Center.
Bids will be received until *2:00p.m. CST on Wednesday, July 20th, *2011 and will thereafter be publicly opened and read aloud in Room 105 of the Facilities Administration Building, 801 6th Avenue South, Birmingham, AL 35294-4554. Bids must be submitted on Proposal Forms furnished. Bids shall be clearly identified on the exterior of the package with the bidder’s name, address, State license number, the name of the project being bid, time and place of the bid opening. Sealed bids shall be properly identified.
On the date of the bid opening Bids may be hand delivered or received by Express Service mail at the Office of the Associate Vice President for Facilities, 801 6th Avenue South, Facilities Administration Building, Room 154, Birmingham, AL 35294, or received by US Postal Service mail at the Office of the Associate Vice President for Facilities, FAB 154 1530 3rd Avenue South, Birmingham, AL 35294-4554 respectfully *until 12:00 *noon. After 12:00 noon of the date of the bid opening, bids must be hand delivered and presented at the bid opening. One original copy of the sealed bid shall be submitted and shall be properly identified. All bids received after *2:00 P.M. on Wednesday July 20th, 2011 will be returned unopened.
Construction Contracts shall be awarded only to qualified Contractors, licensed by the State Licensing Board for General Contractors, as required by Title 34, Chapter 8, Code of Alabama. Construction Contracts in excess of $50,000 shall be awarded only to Contractors licensed as required by the 1978 Code of Alabama, Title 34, Chapter 8 as amended. Formal pre-qualification for bidders is not required, however, bidders must be “responsible” in accordance with criteria in the bid documents and as stipulated by Title 39-2-4-(e) of the Code of Alabama.
A Cashier’s Check drawn on an Alabama Bank or bid bond, executed by a Surety company duly authorized and qualified to make such bonds in Alabama, payable to The Board of Trustees of the University of Alabama in the amount of 5% of the amount of bids, but in no event more than $10,000.00, must accompany the bidder’s bids. Performance and Labor and Material Payment Bonds in the amount of 100% of the contract price will be required when the Contract is presented by the Contractor to the Owner.
UAB has designated that bid documents will be available for examination at the Plan Room of McGraw-Hill Construction Dodge, 3000 3rd Avenue South, Birmingham, AL 35233; at AGC Internet Plan Room, 5000 Grantswood Road, Irondale, AL 35210; at The Birmingham Construction Industry Authority, 3600 Fourth Avenue South, Birmingham, AL 35222; and at the Reed Construction Data Office, 30 Technology Pkwy. South, Suite 500, Norcross, GA 30092-2912. Plans will be available for purchase, at cost to bidders, from Alabama Graphics in Birmingham, AL.
*Scope of Work:
This project involves the demolition of an existing 2 story (plus partial basement) structure identified as the Lane Center Building, located at 410 13th Street South, Birmingham, AL. Work limits are limited to the building’s footprint and immediate adjacent area. Existing utilities are to be capped, terminated and marked for future identification by the Owner. Partial basement void is to be filled to grade per the contract documents.
BT06/23/11
###
__________________
*LEGAL NOTICE
In accordance with Chapter 1, Title 39, Code of Alabama, 1975, notice is hereby given
that *BENNETT BUILDING, INC., Contractor, has completed the Contract for Construction of
Classroom Addition at West Blocton High School and Cafeteria Addition at West Blocton High School (09-193)
at *4734 Truman Aldrich Parkway, West Blocton, Alabama
for the State of Alabama and the* Bibb County Board of Education, Owner(s), and have made request for final settlement of said Contract. All persons having any claim for labor, materials, or otherwise in connection with this project should immediately notify
McKee and Associates Architecture and Interior Design
P.O. Box 2108
Montgomery, Alabama 36104
Bennett Building, Inc.
120 Shadey Acres Road
Alabaster, Alabama 35007
BT06/23/11
###
AF Group wins removal and recycling of the Norpipe H7-platform contract
Large offshore demolition and recycling contract for the AF Group :
The AF Group has been awarded a Letter of Intent with Statoil, on behalf of Gassco as operator, regarding removal and recycling of the Norpipe H7-platform.
The platform is located at the German continental shelf of the North Sea, and has been a part of the pipeline which exports gas to Europe. The Letter of Intent covers planning, engineering, removal and demolition of the installation. The Letter of Intent also includes an option to decommission a similar platform, B11.
Environmental Base Vats on the west coast of Norway will be used as decommissioning site. The site is Europe's most modern decommissioning facility for
decommissioned offshore installations.
The contract value is approx. NOK 420 million ($53 million), excl. abovementioned option works. A condition for the contract is a final decision by the ownership Gassled on the implementation of the removal project.
The work will start immediately, and is planned to conclude by the end of 2016.
- The AF Group has built up expertise and capacity to handle removal and recycling of obsolete petroleum installations. It is therefore a recognition that Statoil, on behalf of Gassco, has chosen us for this mission. The work lays the foundation for further growth within our environmental business in the North Sea, says Pål Egil Rønn, CEO of the AF Group.
The AF Group has been awarded a Letter of Intent with Statoil, on behalf of Gassco as operator, regarding removal and recycling of the Norpipe H7-platform.
The platform is located at the German continental shelf of the North Sea, and has been a part of the pipeline which exports gas to Europe. The Letter of Intent covers planning, engineering, removal and demolition of the installation. The Letter of Intent also includes an option to decommission a similar platform, B11.
Environmental Base Vats on the west coast of Norway will be used as decommissioning site. The site is Europe's most modern decommissioning facility for
decommissioned offshore installations.
The contract value is approx. NOK 420 million ($53 million), excl. abovementioned option works. A condition for the contract is a final decision by the ownership Gassled on the implementation of the removal project.
The work will start immediately, and is planned to conclude by the end of 2016.
- The AF Group has built up expertise and capacity to handle removal and recycling of obsolete petroleum installations. It is therefore a recognition that Statoil, on behalf of Gassco, has chosen us for this mission. The work lays the foundation for further growth within our environmental business in the North Sea, says Pål Egil Rønn, CEO of the AF Group.
We assist in demolition recycling of ewaste, Oak Knoll Demolition
The Electronic Recycler assists demolition companies in the proper disposal and recycling of electronic equipment and pay you by the pound. Many state laws require companies to properly recycle all electronics, medical, and telecommunications equipment especially in a controlled demolition project. More and more U.S. cities are starting to require, or strongly encourage, contractors to minimize the amount of construction, hazardous and demolition material being sent to the landfill. At The Electronic Recycler we like to call this Green Demolition, or as contractors call it Interior gut out. My company will pick up for free and recycle anything (Nationwide) from a demolition project with a cord or battery including but not limited to:
*Business Phones, Avaya, Cisco, Nortel, etc.
*Computer Components, motherboards, RAM sticks, Finger cards, Hard drive boards, motherboards, processors, towers, IC Chips, printers, fax machines, scanners.
*All medical equipment from hospitals.
*All computer, data, and telecommunication wire
*Telecom components, Cisco, 3Com, Qlogic, Nortel,etc. Dialogic Boards, telephone systems, pci cards, ISA cards,panels, channel banks, tape drives, Modules, racks, whole chassis, routers, switches, etc.
*X-ray/Litho Film
*Pagers
*Pager Parts
*Cell Phones
*Cell Phone Parts
*Cell Phone Batteries, chargers
*Cell Phone Accessories
If you don’t see it on our list, send it anyway.
Please assist us in keeping the scrap from landfills. We will keep it simple for any electronics manufacturer, demolition company, wireless company or fundraising program. We will send a truck (FED EX, freight) to your doorstep, you can load it up and we pay for shipping. We can send a shipping label via email or send a trailer to your location. On large quantities we will have our freight company arrange shipping. Please send pictures for proper evaluation.
Todd Klimson
The Electronic Waste Recycler
352-292-2736- Cell
Sarasota, FL
tdklim1966@gmail.com
Tuesday, June 28, 2011
Demolition Bid - RFP Dayton, Ohio
Accepting Bids
June 28, 2011
Sealed bids will be received at the Butler Township Administration Building, 8524 N. Dixie Drive, Dayton, OH 45414, until 11:00 a.m. for the Rodeway Inn Demolition Project on July 22, 2011 as soon thereafter as the opening can begin in the Trustees Meeting Room.
The work consists of the DEMOLITION of the former Rodeway Inn located at 4079 Little Road. Bidders are required to pick up a bid packet for further specifications and plans. One Prime Contract is required for General Trades Demolition and removal of hazardous/regulated materials (asbestos).
Specifications are available at the Butler Township Administration Building, 8524 North Dixie Drive, Dayton, OH 45414, at a cost of Twenty-Five dollars ($25.00), nonrefundable, for one set of documents, made payable to the Butler Township Trustees.
Recycle All Electronics
Todd Klimson
352.502.4449
June 28, 2011
Sealed bids will be received at the Butler Township Administration Building, 8524 N. Dixie Drive, Dayton, OH 45414, until 11:00 a.m. for the Rodeway Inn Demolition Project on July 22, 2011 as soon thereafter as the opening can begin in the Trustees Meeting Room.
The work consists of the DEMOLITION of the former Rodeway Inn located at 4079 Little Road. Bidders are required to pick up a bid packet for further specifications and plans. One Prime Contract is required for General Trades Demolition and removal of hazardous/regulated materials (asbestos).
Specifications are available at the Butler Township Administration Building, 8524 North Dixie Drive, Dayton, OH 45414, at a cost of Twenty-Five dollars ($25.00), nonrefundable, for one set of documents, made payable to the Butler Township Trustees.
Recycle All Electronics
Todd Klimson
352.502.4449
Recycle All Electronics on Facebook
Recycle All Electronics Friend request us on Facebook: http://t.co/6zMxdM2
Premier Electronic Recycling Center in Ocala, Florida!
PUBLIC WELCOME! Open Monday - Friday ~ 9 am - 4pm
Located in the warehouses just off 17th Street & MLK,
across from Target & O.E.C., behind Community Bank
1500 SW 17th Avenue
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
CALL TODAY! (352) 502-4202
Todd Klimson
Premier Electronic Recycling Center in Ocala, Florida!
PUBLIC WELCOME! Open Monday - Friday ~ 9 am - 4pm
Located in the warehouses just off 17th Street & MLK,
across from Target & O.E.C., behind Community Bank
1500 SW 17th Avenue
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
CALL TODAY! (352) 502-4202
Todd Klimson
For Sale: (1200) HP Inkjet 1200 Printers
Up for sale is (1200) Used/Functional - HP Business Inkjet 1200dtn Color Ink-jet printer - 28 ppm - 400 sheets.
Please call for pricing or make offer:
Todd Klimson
Pager & Cellular
Recycle All Electronics
1500 SW 17th Ave
Building 300
Ocala, FL 34471
352-502-4449 - Ext. 126
352-426 2716- Cell
352-351-1322
todd@pagerandcellular.com
Go Green Demolition projects. Company assists Strip outs on demand.
We assist demolition companies in the proper disposal and recycling of electronic equipment. After the interior demolition and strip-outs we step in and remove the electronic waste for site clearance. Many state laws require companies to properly recycle all electronics, medical, and telecommunications equipment especially in a controlled demolition project. More and more U.S. cities are starting to require, or strongly encourage, contractors to minimize the amount of construction, hazardous and demolition material being sent to the landfill. At Pager and Cellular Communications, LLC we like to call this Green Demolition, or as contractors call it Internal demolition. We also specialize in Data Center Strip Outs, UPS Decomissioning, and E-waste Disposal Solution For Demolition Companies. My company will pick up for free and recycle anything from a demolition project with a cord or battery including but not limited to:
*Business Phones, Avaya, Cisco, Nortel, etc.
*Computer Components, motherboards, RAM sticks, Finger cards, Hard drive boards, motherboards, processors, towers, printers, fax machines, scanners.
*All medical equipment from hospitals.
*All computer, data, and telecommunication wire
*Telecom components, Cisco, 3Com, Qlogic, Nortel,etc. Dialogic Boards, telephone systems, pci cards, ISA cards,panels, channel banks, tape drives, Modules, whole chassis, routers, switches, etc.
*X-ray/Litho Film
*Pagers
*Pager Parts
*Cell Phones
*Cell Phone Parts
*Cell Phone Batteries, chargers
*Cell Phone Accessories
If you don’t see it on our list, send it anyway.
Please assist us in keeping the scrap from landfills. We will keep it simple for any electronics manufacturer, demolition company, wireless company or fundraising program. We will send a truck (FED EX, freight) to your doorstep and pay for shipping. We can send a shipping label via email. On large quantities we will have our freight company arrange shipping. Please have all material palletized and shrink-wrapped with pictures for proper evaluation.
Todd Klimson
Pager & Cellular
Recycle All Electronics
1500 SW 17th Ave
Building 300
Ocala, FL 34471
352-502-4449 - Ext. 126
352-426 2716- Cell
352-351-1322
todd@pagerandcellular.com
Monday, June 27, 2011
Federal Legislation Would Fund Research into E-Waste Recycling
U.S. Rep. John Sarbanes, D-Md., has introduced legislation that would fund research into electronic waste (e-waste) recycling. Called the “Electronic Device Recycling Research and Development Act,” the bill would authorize the U.S. Environmental Protection Agency (EPA) to issue grants for research and development projects that would explore ways to increase e-waste recycling.
The bill also would fund a study on the obstacles to e-waste recycling.
“Recycling electronic waste is a win-win for our economy and our environment,” Sarbanes said in a press release. “It reduces the environmental impact of high-tech manufacturing, reduces cost, and makes U.S. companies less dependent on foreign suppliers of minerals and other materials.”
“Business owners recognize that the future of manufacturing in America will be based on innovation and sustainable processes,” Sarbanes added.
RECYCLE ALL ELECTRONICS
Todd Klimson
1.352.502.4449
The bill also would fund a study on the obstacles to e-waste recycling.
“Recycling electronic waste is a win-win for our economy and our environment,” Sarbanes said in a press release. “It reduces the environmental impact of high-tech manufacturing, reduces cost, and makes U.S. companies less dependent on foreign suppliers of minerals and other materials.”
“Business owners recognize that the future of manufacturing in America will be based on innovation and sustainable processes,” Sarbanes added.
RECYCLE ALL ELECTRONICS
Todd Klimson
1.352.502.4449
Turning trash into treasure - Technology - NewsObserver.com
Turning trash into treasure - Technology - NewsObserver.com
Starting Friday, it will be against the law to put electronic equipment, including computers, televisions and printers, in North Carolina landfills.
Recycle all Electronics, LLC
Todd Klimson
352.502.4449
Starting Friday, it will be against the law to put electronic equipment, including computers, televisions and printers, in North Carolina landfills.
Recycle all Electronics, LLC
Todd Klimson
352.502.4449
This 45-Mile "Wi-Fi" Could Connect a Smarter Power Grid - Technology Review
This 45-Mile "Wi-Fi" Could Connect a Smarter Power Grid - Technology Review
Ultra-link Processing by San Diego startup On-Ramp Wireless
Recycle All Electronics, LLC
Todd Klimson
352.502.4449
Ultra-link Processing by San Diego startup On-Ramp Wireless
Recycle All Electronics, LLC
Todd Klimson
352.502.4449
Subscribe to: